Search Results

Food 4 Less, Riverside

January 21st, 2014 by Fiedler Group

In December, Food 4 Less re-opened the Van Buren Boulevard fueling facility in the City of Riverside. Read the rest of this entry »

McDonald’s, Murrieta

January 7th, 2014 by Fiedler Group

Fiedler Group is excited to announce the opening of another McDonald’s located at 40605 California Oaks Road in the City of Murrieta, California. Read the rest of this entry »

McDonald’s, Loma Linda

October 15th, 2013 by Fiedler Group

Fiedler Group was retained by McDonald’s USA to provide full entitlement, building and civil design and permit services for a new restaurant in Loma Linda. Read the rest of this entry »

Clients

July 26th, 2013 by Patrick Fiedler

 

Alternative Fuels Clients

BP Architecture Engineering Chevron architecture engineering Clean Energy architecture engineering
Hyundai architecture engineering Iwatani Shell architecture engineering
SoCal Edison architecture engineering socalgas architecture engineering toyota-architecture-engineering

 


 

Retail Petroleum Clients

Arco Architecture Engineering BP Architecture Engineering Chevron architecture engineering
ConocoPhilips architecture engineering ExxonMobile architecture engineering Shell architecture engineering
Tesoro architecture engineering texaco architecture engineering Ralphs architecture engineering
Food 4 Less architecture engineering Foods Co architecture engineering vons architecture engineering
Circle K architecture engineering SC Fuels architecture engineering DeWittIPS architecture engineering

 


 

Food Service Projects

aw architecture engineering baskin robbins architecture engineering carls jr architecture engineering
cowboy burgers architecture engineering del taco architecture engineering ihop architecture engineering
jack in the box architecture engineering Mcdonalds architecture engineering pizza hut architecture engineering
sonic-architecture-engineering sonoma-coffee-architecture-engineering Subway architecture engineering
Subway architecture engineering taco bell architecture engineering taco time architecture engineering
tcby architecture engineering Wienerschnitzel architecture engineering  

 


 

Convenience Store Clients

711 architecture engineering AMPM architecture engineering Arco Architecture Engineering
Couche-Tard architecture engineering Circle K architecture engineering extra mile architecture engineering
famima architecture engineering on the run architecture engineering starmart architecture engineering

 


 

Retail/Commercial Clients

CVS architecture engineering family-dollar architecture engineering kaiser-permanente-architecture-engineering
west coast choppers architecture engineering

 


 

Government/Utilities Clients

CHP-architecture engineering City-of-Los-Angeles- architecture engineering City-of-Montebello architecture engineering
City of Pasadena architecture engineering ladwp architecture engineering
long beach transit architecture enginerring SoCal Edison architecture engineering socalgas architecture engineering

 

Hydrogen Facilities

June 14th, 2013 by Fiedler Group

Since its founding in 1957, Fiedler Group has prided itself in being a leading supplier of innovative engineering and architectural design services.  It’s this commitment that consistently positions Fiedler Group among industry leaders — revolutionizing technologies, processes, and advancements.

Working closely with all three big energy partners — Shell, BP, and Chevron, Fiedler Group has participated in the development of eight different hydrogen fueling stations.

Our project development services have included:

Fiedler Group assisted our energy partners with the development of numerous different hydrogen generation and distribution fueling applications:

Hydrogen generation through Steam Methane Reforming (SMR) of natural gas and water into hydrogen in these locations:

  • Chevron, Chino, CA. (February, 2005)
  • Chevron, Orlando, FL. (May, 2007)
  • Shell, Newport Beach, CA. (July, 2012) – The first high-pressure hydrogen fueling station aimed at private consumers in California, and the first to serve four hydrogen-powered vehicles at the same time.

Hydrogen generated on-site using electrolysis to convert city water into purified hydrogen in these locations:

  • BP, Los Angeles International Airport, CA. (October, 2004)
  • Chevron, Rosemead, CA. (May, 2007)
  • Shell, West Los Angeles, CA. (November, 2008) – The first integrated gasoline/hydrogen station in California

Hydrogen delivered to site in tube trailers:

  • Shell,  Culver City, CA (June, 2009)

Hydrogen delivered directly to site by tapping into an existing hydrogen pipeline:

  • Shell,  Torrance, CA.  (June, 2011) – A collaborative effort between Shell, Toyota, Air Products, South Coast Air Quality Management District (SCAQMD), and the Department of Energy (DOE) which was the nation’s first station to tap directly into an existing hydrogen pipeline, and first station capable of simultaneously refueling four vehicles at once from two dispensers

To learn more about Fiedler Group’s expertise in the alternative fuels industry, and how the Fiedler Group team can assist you with your project, contact us today.

Valley Pacific Petroleum Enhances Santa Maria Chevron Truck Stop

June 4th, 2013 by Fiedler Group

Valley Pacific Petroleum Services, Inc (VPPS) is proud of its 60+ year association with Chevron.

Headquartered in Stockton, California, the company provides hundreds of thousands of bulk lubricant storage and distribution Read the rest of this entry »

Kroger Fuel Sales Tops Big-Box Retailers in Latest NACS Retail Fuels Report

March 5th, 2013 by Fiedler Group

The National Association of Convenience Stores recently released their 2013 NACS Retail Fuels Report summarizing the current status of the U.S. Petroleum Industry. Read the rest of this entry »

FoodsCo, Fresno

March 5th, 2013 by Fiedler Group

On February 13th, FoodsCo opened its newest California retail fueling facility in Fresno. Read the rest of this entry »

McDonald’s La Mesa, San Diego, and Fontana

January 29th, 2013 by Fiedler Group

In November, we recapped four McDonald’s projects Fiedler Group worked on — two new build locations and two major rebuild projects. Read the rest of this entry »

Fiedler Group Celebrates 55 Years

January 8th, 2013 by Fiedler Group

Fred Stanton Fiedler was just 23 years old in 1946. Fresh out of the Army Air Corp, he joined Union Oil Company’s Construction and Engineering Department.

Over the next eleven years, Fiedler worked in a Read the rest of this entry »